A 20 × 22 garage, built the same year as the legal suite in the house
A 20 by 22 detached garage off the lane in northwest Calgary, for the owners whose legal basement suite we finished the same year. It sits on a new pad with 6 in concrete curb walls on three sides. Inside it is insulated and drywalled, with fire-rated drywall where the City requires it, under an 8 ft ceiling. The white 16 by 7 insulated door runs on a ceiling-mount opener, and the siding and shingles match the house.

- Footprint
- 20 ft × 22 ft (440 sq ft)
- Ceiling height
- 8 ft, the standard
- Overhead door
- 16 ft × 7 ft, white, insulated
- Opener
- Chain drive on the ceiling, two remotes
- Doors and window
- Man door on the yard-side gable end, a motion light above it · sliding window on the side wall
- Inside
- Insulated, 6 mil vapour barrier, 1/2 in drywall · fire-rated drywall where the City requires it
- Power
- A lantern each side of the overhead door · two interior lights, two receptacles
- Exterior
- Vinyl siding matched to the house, trim around the doors, aluminium soffit and fascia, 5 in continuous eavestrough and downspouts
- Roof
- Engineered trusses, asphalt shingles matched to the house, two roof vents, drip edge
- Structure
- 2 × 4 studs at 24 in on centre, pressure-treated bottom plate, 3/8 in OSB on the walls and roof
- Concrete
- New pad with 6 in curb walls on three sides, and an apron to the lane
Around the garage






What the City checked
The photos show the finish. The inspection cared about these.
Curb walls first, framing after
The pad was poured in June with 6 in concrete curb walls along the back and both sides. The walls are framed on top of them, so the wood starts above the slab, and the meltwater and snow a car brings in stay on the concrete. The bottom plate is pressure-treated as well.
Fire-rated board where the City asks for it
Calgary requires fire-rated drywall on a garage wall that sits within 0.6 m of a property line, and this garage has it where the code calls for it. The rest of the inside is insulated, covered in a 6 mil vapour barrier and boarded in 1/2 in drywall.
Two permits, both part of the job
We drew the garage plans and applied for the building permit and the electrical permit. The building permit covers the garage; the electrical permit covers the wiring for its lights and receptacles.
Build one like this on your lot
A site visit measures the lot, checks setbacks and access, and tells you what fits. You get a written quote, itemized line by line.
- 01A call backA short call about what you want to build, what your lot allows, and what it usually costs to be wrong about.
- 02An hour on siteWe measure, look at access and grade, and tell you what is buildable. No obligation, no charge.
- 03A written quoteItemized line by line, with the spec attached, so you can see what moves the number.
Prefer to talk? (403) 667-9800, Monday to Friday, 9am to 10pm. WeChat wxabls.